Maintenance: Difference between revisions

From High Salvington Mill Trust
Access restrictions were established for this page. If you see this message, you have no access to this page.
(→‎Documented Procedures: Added link for When to Turn the Mill (from Nick Howland))
Line 15: Line 15:
*[[Raising the Head Runner Stone 2023]]
*[[Raising the Head Runner Stone 2023]]
*[https://highsalvingtonmilltrust.co.uk/wiki/files/Lowering%20the%20Runner%20Stone%202023.pdf Lowering the Head Runner Stone 2023]
*[https://highsalvingtonmilltrust.co.uk/wiki/files/Lowering%20the%20Runner%20Stone%202023.pdf Lowering the Head Runner Stone 2023]
*[[When to Turn the Mill]]


==Engineering Documents==
==Engineering Documents==

Revision as of 19:40, 5 November 2023

Maintenance

See also Restoration

Maintenance Schedule

Documented Procedures

Engineering Documents

The following is a list of general windmill-related engineering documents.

Historic Maintenance

For some historic maintenance tasks media or documentation was generated to record the procedure for the benefit of future maintainers who may need to do something similar and would be interested in how the task was last, or usually, carried out.

See Projects.

Crown Tree Replacement
1976?
Ridge Lead Work
Completed on 1st August 2009
BirdX Sealing and Anti Bird Measures
Completed on 15th May 2010