Maintenance

From High Salvington Mill Trust
Revision as of 20:29, 5 November 2023 by Jeffrey.Best (talk | contribs) (→‎Engineering Documents: Flagged an engineering document link as a video, rather than a document.)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Maintenance

See also Restoration

Maintenance Schedule

Documented Procedures

Engineering Documents

The following is a list of general windmill-related engineering documents.

Historic Maintenance

For some historic maintenance tasks media or documentation was generated to record the procedure for the benefit of future maintainers who may need to do something similar and would be interested in how the task was last, or usually, carried out.

See Projects.

Crown Tree Replacement
1976?
Ridge Lead Work
Completed on 1st August 2009
BirdX Sealing and Anti Bird Measures
Completed on 15th May 2010