Mill Manual: Difference between revisions
From High Salvington Mill Trust
(Added link to After Operating the Windmill) |
(Added section link for sail climbing.) |
||
Line 4: | Line 4: | ||
## [[Before Operating the Windmill]] | ## [[Before Operating the Windmill]] | ||
## [[Operation of the Brake]] | ## [[Operation of the Brake]] | ||
## [[Sail Climbing]] | |||
## [[Setting the Sails]] | ## [[Setting the Sails]] | ||
## [[Sails Only Turning]] | ## [[Sails Only Turning]] |
Latest revision as of 20:35, 2 August 2021
The High Salvington Windmill Manual was originally written and illustrated by Peter Casebow and Bob Potts. Minor recent additions and updates have been made by Jeff Best and Hazel Marsden.
- General Safekeeping of the Mill
- Operating the Mill
- Opening up the Mill for Visitors
- Mill Guides
- Health & Safety
- Mill Maintenance
- Risk Assessments
- Guide Notes
- Administration
- Glossary
Advance to Chapter 1 - General Safekeeping of the Mill